Structonix Logo

Engineering Tomorrow's Horizon

HomeServicesPrimary Steel Structure Manufacturing

Primary Steel Structure Manufacturing

Primary Steel Structure Manufacturing

Service Overview

We manufacture heavy-duty primary steel components—including columns, rafter sections, crane beams, and portal frames—in our state-of-the-art fabrication facility. Using high-tensile steel plates and automated submerged arc welding (SAW), we create built-up members that deliver superior load-bearing capacity and seismic resistance. Every member undergoes strict quality control, non-destructive testing (NDT), and surface preparation before delivery.

Key Advantages

Automated plate cutting and Submerged Arc Welding (SAW) for deep penetration

Use of high-grade steel plates (E250/E350 Grade) with mill test certificates

Custom fabrication of tapered and straight built-up sections to match structural plans

Rigorous Non-Destructive Testing (NDT) including Ultrasonic and Dye Penetrant testing

High-performance anti-corrosive primer and finish paint systems

Technical Specifications

ParameterStandards / Details
Material GradeIS 2062 E250 / E350 BR/BO, ASTM A572 Grade 50
Welding StandardsAWS D1.1 / ASNT Level II certified welders
Surface TreatmentShot blasting to Sa 2.5 standard, epoxy-based primers
Section TypesBuilt-up H-beams, I-beams, Box columns, crane runway beams
Testing ProtocolsUltrasonic Testing (UT), Magnetic Particle Testing (MPT), Visual Inspection

Frequently Asked Questions

What steel grades do you use for primary columns and rafters?

We use high-tensile steel plates complying with IS 2062 E250 and E350 grades, as well as ASTM standards, depending on the client's specifications and load requirements.

How do you ensure the quality of welds in primary members?

All our welders are certified to AWS D1.1 standards. We perform Ultrasonic Testing (UT) on 100% of full-penetration butt joints, alongside daily visual and dye-penetrant testing.

Showcase

Relevant Projects

Explore some of our real-world execution highlights related to Primary Steel Structure Manufacturing.

View All Projects
B5 Paramount
Handovered
Factory & Process Plant

B5 Paramount

Paramount Sawad Naka, Bhiwandi
1,420 Tons Steel Tonnage
332,759 Sq.ft. Area
PROJECT NO: 003Details
Shree Krishna Farm
Handovered
Factory & Process Plant

Shree Krishna Farm

Nichole, Wada
65 Tons Steel Tonnage
1,609.2 Sq.ft. Area
PROJECT NO: 010Details
Shri Krishna Pharma
Erection
Factory & Process Plant

Shri Krishna Pharma

Pali Phata, Wada
104.5 Tons Steel Tonnage
27,500.2 Sq.ft. Area
PROJECT NO: 025Details
Chat with us on WhatsApp